Hero Background
Sunny Moon
End of construction in May 2026
Sunny Holding
Thailand, Phuket, Nai Harn Beach area

Apartment Complex by Sunny Holding with 11% Annual Yield

Every day at Sunny Moon is filled with unforgettable experiences. Your day kicks off with stunning views of the sea and the natural beauty of Phuket!

Completion
Section 1 and 2 - May 2026
Section 3 - 3nd quarter 2027

Every day at Sunny Moon is filled with unforgettable experiences. Your day kicks off with stunning views of the sea and the natural beauty of Phuket!

We ensure high liquidity of the investment project due to:

  • Unique location

  • Iconic architecture

  • Own management company

  • Our proven experience in 7 countries around the world

  • Filling for the most sought-after tourist

  • Filling for the most sought-after tourist

  • Possibility of direct contact with Shareholders

  • High ratings of 9+ for all our properties in booking systems

Amenities

The best that Phuket has to offer and even more. A balance between nature and modernity, development and leisure, activity and relaxation.

  • 01
    Healing

    Ayurvedic center

  • 02
    Cinema

    Rooftop cinema

  • 03
    Ecological energy

    Solar panels

  • 04
    Bar

    Rooftop bar

    Restaurant with fine cuisine

  • 05
    Fitness

    Gym

  • 06
    Sauna

    Sauna with panoramic view

  • 07
    Library

    Library with reading room

  • 08
    For children

    Children’s room

  • 09
    Charger

    Charging for electric cars

  • 10
    Spa

    SPA center with a wide range of services

  • 11
    For work

    Coworking and meeting rooms

  • 12
    VR

    Room for adults, VR Space

  • 13
    Art

    Art lobby

  • 14
    Pool

    Rooftop seawater pool

Project location

Phuket's average annual hotel occupancy rate is projected at 84% in 2024 (+3% YoY). The average nightly rate has increased by 30% YoY*.

Nai Harn Beach ranks among the top 5 beaches in Asia according to TripAdvisor Travelers' Choice.

With virtually no new construction in the Nai Harn area, high demand leads to limited supply, enabling properties to achieve maximum occupancy rates.

  • One of the most tranquil areas of Phuket. It attracts nature and aesthetics lovers rather than group tourists. They spend more and complain less.

  • Within a 2 km radius, you'll find all the necessary infrastructure for tourists, including Phuket's cleanest beach, restaurants, shops, sports clubs, yoga studios, international schools, and clinics.

  • Stunning beaches, breathtaking nature, well-developed infrastructure, and a welcoming atmosphere make this area both attractive and exclusive.

*Source: Knight Frank

In-house management company

With extensive experience in launching properties in Bali from the ground up. We tackle operational challenges for investors and ensure sustained high liquidity for our properties over the long term.

  • $200K+

    Monthly payments to investors

  • 85%

    Average occupancy of our completed properties

  • Up to 9%

    Average annual return on investment

Guest ratings across professionally managed projects
9.2 Out of 10
Guest satisfaction across Sunny Holding projects
4.95 Out of 5
Hero background
  • We are a partner of the premium hotel chain Marriott, so we uphold the highest global service standards.

  • We guarantee complete transparency at every stage and provide all necessary documentation.

Request a detailed consultation and calculation to learn about purchasing options and installment plans.

Stanislav Asoskov

Leading real estate expert Sunny Holding

Layouts sections 1 and 2

Every square meter of the project is carefully considered. In our layouts, we meticulously calculate all possible scenarios and ways to use the space efficiently.

    • from 33,5 m²
    • from 57,5 m²
    • from 110 m²
    • from 165 m²

Layouts section 3

    • from 33,5 m²
    • from 57,5 m²
    • from 57,5 m²
    • from 110 m²
    • from 110 m²
    • from 165 m²

Sunny Moon Third Edition will include:

  • Grohe Plumbing Fixtures (Germany)

  • Blum Hardware (Austria)

  • Gorenje Kitchen Appliances (Slovenia)

  • Smart Home Control System

  • Water Purification Filters in Apartments

  • Infinity Pool with Seawater

Сonstruction progress

Owned plot, received by EIA, land work in progress

As of January 1, the following works have been completed:

    Section 1

  • Zones A and B are combined.

  • Parking
    Preparation of walls and ceilings for painting has been completed; some materials are temporarily stored on site.

  • Residential area (floors 2–7)
    — Sanitary and electrical systems: 90–100%
    — Low-voltage systems: approx. 90%, in progress
    — Unit finishes: 65–90%
    — Window installations: 40–90%
    — Doors: 70–85%
    — Kitchen furniture and lighting fixtures: in progress (30–70%)

  • Corridors and common areas
    — Floor tiling completed
    — Wall finishes: 70–80%
    — Elevator lobbies under finishing works
    — Internal fire hydrant cabinets installed

  • Additional works
    — Facades: 82%, balconies: 75%
    — Fire escape staircase and roof insulation: in progress
    — Engineering systems testing underway
    — Reinforced concrete works completed in the swimming pool; waterproofing in progress
    — Retaining wall: works near the parking area nearing completion, followed by backfilling and stormwater drainage
    — Engineering and fire safety equipment being delivered
    — Glass balcony railings in production
    — Contractor completed measurements of elevator portals for Buildings 1 and 2

Commissioning:
Sections 1 & 2 — Q1 2026
Section 3 — Q3 2027

    Section 2

  • Zones A and B are combined.

  • Commercial floor
    Walls and ceilings prepared for painting.

  • Residential area
    — 1st floor: engineering systems — 95%, finishes and doors — 50%
    — 2nd floor: masonry completed; wall and ceiling finishes — 70%, engineering works in progress
    — 3rd–4th floors: engineering systems — 40–55%, finishes — up to 40%
    — 5th floor: start of finishing and engineering works
    — 6th–7th floors: masonry nearing completion; installation of engineering systems started

  • Corridors and common areas
    — Installation of fire protection risers
    — Finishing of common areas and niche construction in progress

  • Additional works
    — Sanitary system risers: 50%
    — Perimeter balconies: 60%
    — Facades: 15%
    — Retaining wall: structural works completed, drainage — 50%
    — Main staircase completed up to the 2nd floor; works ongoing
    — Testing of cable lines and sanitary systems initiated

Commissioning:
Sections 1 & 2 — Q1 2026
Section 3 — Q3 2027


Have any questions?

Drop your contact info, and our expert manager will reach out to answer any questions you have!

`

Our social media